Cabiúnas

Dutos do Terminal de Cabiúnas
Open Map

The pipelines that cross through Cabiúnas, in Northern Fluminense are: Gascav, Gascab (I, II and III), Enchovão, Gasduc (I, II and III).

The Gascav (Cabiúnas to Vitória) gas pipeline ranges for 303 km and connects the Cabiúnas Terminal, in Macaé (Rio de Janeiro), to the Serra Intermodal Terminal Station (Espírito Santo).

The Gascab gas pipelines (I, II and III) make the connection between Barra do Furado and Cabiúnas. The three pipelines are the same length: 67 km.

A 5 km gas pipeline, Enchovão, connects Cabiúnas to the beach.

The Gasduc pipelines connect the district of Cabiúnas, in Macaé, to the Duque de Caxias Refinery. The first gas pipeline is 184 km long, Gasduc II is 182.1 km long, and Gasduc III is 181 km long.

Check out the information about the sections:

- Gascav (Cabiúnas-Vitória Gas Pipeline)
Diameter: 28"
Operation Commencement: 2008

- Gascab I (Rio de Janeiro)
Diameter: 18"
Operation Commencement: 1982

- Gascab II (Rio de Janeiro)
Diameter: 20"
Operation Commencement: 2002

- Gascab III (Rio de Janeiro)
Diameter: 22"
Operation Commencement: 1982

- Enchovão (Rio de Janeiro)
Diameter: 18"
Operation Commencement: 1990

- Gasduc I (Rio de Janeiro)
Diameter: 16"
Operation Commencement: 1982

- Gasduc II (Rio de Janeiro)
Diameter: 20"
Operation Commencement: 1996

- Gasduc III - Cabiúnas-REDUC Gas Pipeline
Diameter: 38"
Operation Commencement: 2010